On Call Engineering Services – (Proposal Due: 12/29/2016)
2017 Tree Replacement Services – (Proposal Due: 12/15/2016)
Bed A Property Line Wall Project, General Contracting Services –(Proposal Due: 12/15/2016)
Consulting Services Related to Finance, Accounting and Auditing – (Proposal Due: 12/2/2016)
Legal Services – (Proposal Due: 11/8/2016)
Phase 5 Pile Remediation and Cellular Sheet Pile Encasement – Marine Construction Services – (Proposal Due: 11/15/2016)
Phase 5 Pile Remediation & Cellular Sheet Pile Encasement – (Proposal Due: 11/2/2016)
200 Rector Street – Interior Fit Out Contractor Services – (Proposed Due: 10/21/2016)
Enterprise Resource Planning Human Resource Information System, System Integrator and Software Vendor Services – (Proposed Due: 9/30/2016)
General Contractor –Planter and Tree Pit Rails / Planting Area Construction – (Proposed Due: 8/29/2016)
South Route 9A Medians – Landscape and Sprinkler Maintenance – (Proposed Due: 8/4/2016)
Pier A – River Water Geothermal System Maintenance – (Proposed Due: 8/12/2016)
Internal Audit Services – (Proposed Due: 7/15/2016) (Withdrawn)
CCTV Installation Project (Discretionary)
Phase 5 and 6 Pile Remediation – Construction Management and Diving Inspection Services – (Proposed Due: 6/21/2016) (Withdrawn)
Eastern Boundary and Pier A Plaza Sanitation Services – (Proposed Due: 6/3/2016)
Eastern Boundary and Pier A Plaza Sanitation Services – (Proposed Due: 6/3/2016)
Asphalt and Granite Remediation – (Proposed Due: 6/16/2016)
Tribeca Bridge Painting – (Proposed Due: 6/13/2016)
Eastern Boundary and Pier A Plaza Sanitation Services – (Proposed Due: 4/27/2016) (Withdrawn)
2016 On-Call General Contractor – (Proposed Due: 5/4/2016)
Hose Replacement – Pier A Heat Exchanger Array – (Proposed Due: 4/1/2016)
Communications and Media Relations Services – (Proposed Due: 3/30/2016)
Microsoft SharePoint Services – (Proposed Due: 03/25/2016)
Asphalt and Granite Remediation – (Proposed Due: 03/16/2016) (Withdrawn)
Microsoft SharePoint Services – (Proposed Due: 03/25/2016)
Tribeca Bridge Painting – (Proposed Due: 02/01/2016) (Withdrawn)
Phase 5 and 6 Pile Remediation – Design and Engineering Services – (Proposed Due: 1/15/2016)
Police Memorial and North Cove Marina Electrical Vault Resilience Project – (Proposed Due: 1/11/2016)
Public Accountant Audit Services – (Proposed Due: 01/06/2016)
Back to Blog Homepage