Contact Information
Questions and feedback about NWBPCR can be sent to nwbpcrinfo@bpca.ny.gov or:
Battery Park City Authority
200 Liberty Street, 24th Floor
New York, NY 10281
att: North/West BPC Resiliency Project TeamPublic Announcements and Correspondence
- Review of North/West Battery Park City Resiliency Project Suggested Alignment Alternative (PDF)
- Battery Park City Authority Gets Expanded Capacity to Fund Major Lower Manhattan Resiliency Projects (Gotham Gazette)
- At Workshops, Hear and Be Heard About Massive BPC Resiliency Projects (Tribeca Trib)
- Grasping the Reach: Public Meeting Tonight Will Discuss Park Resiliency Plans for Rockefeller Park and Belvedere Plaza (The Broadsheet)
- Rockefeller reconstruction meetings start this week (Tribeca Citizen)
- NWBPCR Project Public Meeting #4 Questions Received (w/Answers)
- Flood Protection Planning Begins for Long Stretch of Battery Park City (Tribeca Trib)
- BPCA will pursue design/build plans for resiliency in Tribeca and Rockefeller (Tribeca Citizen)
- BPCA Taps Engineering Firm to Design Resiliency Measure for Neighborhood’s Northern Section (The Broadsheet)
- Bold Flood Protection Ideas Eyed for North BPC and Part of Tribeca (Tribeca Trib)
- Some of Tribeca is in Battery Park City’s Plan for Its Flood Protection (Tribeca Trib)
Environmental Review
Draft Environmental Impact Statement Public Hearing (September 18, 2024)
Public Hearing Presentation (PDF) | Video
Transcript (PDF)
Draft Environmental Impact Statement (August 28, 2024)- Notice of Availability (September 4, 2024) (PDF)
- Public Hearing Notice (August 28, 2024) (PDF)
- Cover and Table of Contents (PDF)
- Executive Summary (PDF)
- 1.0 Project Description (PDF)
- 2.0 Analysis Framework (PDF)
- 3.0 Affected Environment (PDF)
- 3.1 Land Use (PDF)
- 3.2 Open Space (PDF)
- 3.3 Historic and Cultural Resources (PDF)
- 3.4 Urban Design and Visual Resources (PDF)
- 3.5 Natural Resources (PDF)
- 3.6 Hazardous Materials (PDF)
- 3.7 Water and Sewer Infrastructure (PDF)
- 3.8 Transportation (PDF)
- 3.9 Greenhouse Gas Emissions and Climate Change (PDF)
- 3.10 Neighborhood Character (PDF)
- 3.11.1 Construction Overview (PDF)
- 3.11.2 Construction Open Space (PDF)
- 3.11.3 Construction Natural Resources (PDF)
- 3.11.4 Construction Transportation (PDF)
- 3.11.5 Construction Air Quality (PDF)
- 3.11.6 Construction Greenhouse Gas Emissions (PDF)
- 3.11.7 Construction Noise (PDF)
- 3.11.8 Construction Neighborhood Character (PDF)
- 4.0 Mitigation (PDF)
- 5.0 Alternatives (PDF)
- 6.0 Unavoidable Adverse Impacts (PDF)
- 7.0 Irreversible and Irretrievable Aspects of the Proposed Project (PDF)
- 8.0 Growth-Inducing Aspects of the Proposed Project (PDF)
- 9.0 List of References (PDF)
- Appendix A - FSOW (PDF)
- Appendix B - Coastal Modeling Report (PDF)
- Appendix C - WRP & Smart Growth (PDF)
- Appendix D - Historic and Cultural Resources (PDF)
- Appendix E - Natural Resources (PDF)
- Appendix F - Hazardous Materials, F.1a Soil Groundwater Sediment Report (2024) (PDF)
- Appendix F - Hazardous Materials, F.1b Soil Groundwater Sediment Report (PDF)
- Appendix F - Hazardous Materials, F.2 Hazardous Materials RAP & CHASP-(2024) (PDF)
- Appendix F - Hazardous Materials, F.3a Hazardous Materials Investigation & Findings Reports (August 2022) (PDF)
- Appendix F - Hazardous Materials, F.3b Hazardous Materials Investigation & Findings Reports (Feb. 2022) (PDF)
- Appendix F - Hazardous Materials, F.3c Hazardous Materials Investigation & Findings Reports (Feb. 2022) (PDF)
- Appendix F - Hazardous Materials, F.4a Sediment Sampling Analysis (March 2024) (PDF)
- Appendix F - Hazardous Materials, F.4b NYSDEC Sediment Sampling Analysis Approval (April 2024) (PDF)
- Appendix G - Infrastructure (PDF)
- Appendix H - Construction (PDF)
Community Engagement Videos and Presentations
- September 18, 2024: Draft Environmental Impact Statement (DEIS) Public Hearing
- Presentation (PDF) | Video
- Transcript (PDF)
- June 20, 2024: Community Meeting
- FEEDBACK WANTED (EXTENDED): Temporary Space Opportunities (share your thoughts through September 30, 2024)
- Presentation (PDF) | Video
- 60% Design Flythrough Animation
- Questions Received (w/Answers) (PDF)
- Transcript (PDF)
- Exhibition Boards & Topic Table Materials
- Temporary Space Opportunities (Board 1) (PDF)
- Temporary Space Opportunities (Board 2) (PDF)
- Temporary Open Space Map (PDF)
- Tree Impacts and Planting (PDF)
- Project segments; Planting (Biodiversity, Pollinators & Wildlife, Climate Adaptation); Green Infrastructure; Water Quality & Design Considerations; Materials; Flood Barrier System; Benches; Pumphouse Park (PDF)
- SUPPORT POURS IN FOR NORTH/WEST BATTERY PARK CITY RESILIENCY PROJECT
- Hudson River Park Advisory Council: June 11, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Progress Update & Preliminary Construction Schedule): June 6, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 1 & 5): April 16, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 2, 3 & 4): March 18, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 6 & 7): January 4, 2024 | Presentation | Video
- November 30, 2023: Community Meeting
- Interior Drainage Update to Manhattan Community Board 1: October 16, 2023 | Presentation | Video
- North/West Battery Park City Resiliency Project Fall 2023 Project Sitewalks
- June 26, 2023: Community Meeting
- Hudson River Park Advisory Council: June 13, 2023 | Presentation | Video
- Gateway Plaza Tenants Association: May 24, 2023 | Presentation | Video
- Reach Specific Workshops
- Rockefeller Park & Belvedere Plaza: February 8, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- Tribeca & North Esplanade: February 16, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- South Esplanade & South Cove: March 6, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- North Cove: March 15, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- Rockefeller Park & Belvedere Plaza: February 8, 2023
- December 7, 2022 @ CB1 BPC Committee
- Presentation (PDF)
- Video
- Coastal Modeling Paper
- September 19, 2022: Public Meeting #4
- June 29, 2022: Open House/Public Meeting #3
- December 16, 2021 Public Meeting #2
- Summary
- Presentation
- Video: Public Meeting Presentation
- Video: Breakout Room 1
- Video: Breakout Room 2
- Video: Breakout Room 3
- Public Meeting #2 Notice
- Three Community “Walkshops” Through the Project Area
- August 4, 2021 Public Meeting #1
Prior meetings (North BPC Resiliency Project)
The Battery Park City Authority had originally embarked upon the North BPC project as a standalone Design-Bid-Build project, and had completed 30% design when BPCA was granted Design Build Authority by the New York State Legislature in April 2020. As a result, BPCA has determined to proceed with a Progressive Design Build (PDB) approach, which will combine the North BPC Project and the West BPC Project. This PDB approach will provide for the design and construction of the combined North and West BPC Projects (the North/West BPC Resiliency Project) under a single PDB contract.- July 23, 2020 Public Meeting Presentation | Video
- July 23, 2020 Public Meeting Notice
- February 27, 2020 Public Meeting Presentation | Video
- February 27, 2020 Public Meeting Notice
- November 22, 2019 All-Agency Kickoff Meeting – Presentation
- October 1, 2019 Public Meeting Presentation | Video
- October 1, 2019 Public Meeting NoticeNotices
- COMMUNITY NOTICE: NWBPCR PROJECT GEOTECHNICAL SAMPLING WORK AROUND NORTH COVE MARINA
- COMMUNITY NOTICE: NWBPCR PROJECT MARINE BORING WORK
- NORTH/WEST BATTERY PARK CITY RESILIENCY: FALL 2023 PROJECT SITEWALKS
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT: PUBLIC MEETING – JUNE 26
- COMMUNITY NOTICE: NWBPCR PROJECT GEOTECHNICAL SAMPLING WORK
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: NORTH COVE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: SOUTH ESPLANADE & SOUTH COVE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: TRIBECA & THE NORTH ESPLANADE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: ROCKEFELLER PARK & BELVEDERE PLAZA
Construction Updates and Resources
Construction is expected to commence in 2025.
Contact Information
Questions and feedback about NWBPCR can be sent to nwbpcrinfo@bpca.ny.gov or:
Battery Park City Authority
200 Liberty Street, 24th Floor
New York, NY 10281
att: North/West BPC Resiliency Project TeamPublic Announcements and Correspondence
- Review of North/West Battery Park City Resiliency Project Suggested Alignment Alternative (PDF)
- Battery Park City Authority Gets Expanded Capacity to Fund Major Lower Manhattan Resiliency Projects (Gotham Gazette)
- At Workshops, Hear and Be Heard About Massive BPC Resiliency Projects (Tribeca Trib)
- Grasping the Reach: Public Meeting Tonight Will Discuss Park Resiliency Plans for Rockefeller Park and Belvedere Plaza (The Broadsheet)
- Rockefeller reconstruction meetings start this week (Tribeca Citizen)
- NWBPCR Project Public Meeting #4 Questions Received (w/Answers)
- Flood Protection Planning Begins for Long Stretch of Battery Park City (Tribeca Trib)
- BPCA will pursue design/build plans for resiliency in Tribeca and Rockefeller (Tribeca Citizen)
- BPCA Taps Engineering Firm to Design Resiliency Measure for Neighborhood’s Northern Section (The Broadsheet)
- Bold Flood Protection Ideas Eyed for North BPC and Part of Tribeca (Tribeca Trib)
- Some of Tribeca is in Battery Park City’s Plan for Its Flood Protection (Tribeca Trib)
Environmental Review
Draft Environmental Impact Statement Public Hearing (September 18, 2024)
Public Hearing Presentation (PDF) | Video
Transcript (PDF)
Draft Environmental Impact Statement (August 28, 2024)- Notice of Availability (September 4, 2024) (PDF)
- Public Hearing Notice (August 28, 2024) (PDF)
- Cover and Table of Contents (PDF)
- Executive Summary (PDF)
- 1.0 Project Description (PDF)
- 2.0 Analysis Framework (PDF)
- 3.0 Affected Environment (PDF)
- 3.1 Land Use (PDF)
- 3.2 Open Space (PDF)
- 3.3 Historic and Cultural Resources (PDF)
- 3.4 Urban Design and Visual Resources (PDF)
- 3.5 Natural Resources (PDF)
- 3.6 Hazardous Materials (PDF)
- 3.7 Water and Sewer Infrastructure (PDF)
- 3.8 Transportation (PDF)
- 3.9 Greenhouse Gas Emissions and Climate Change (PDF)
- 3.10 Neighborhood Character (PDF)
- 3.11.1 Construction Overview (PDF)
- 3.11.2 Construction Open Space (PDF)
- 3.11.3 Construction Natural Resources (PDF)
- 3.11.4 Construction Transportation (PDF)
- 3.11.5 Construction Air Quality (PDF)
- 3.11.6 Construction Greenhouse Gas Emissions (PDF)
- 3.11.7 Construction Noise (PDF)
- 3.11.8 Construction Neighborhood Character (PDF)
- 4.0 Mitigation (PDF)
- 5.0 Alternatives (PDF)
- 6.0 Unavoidable Adverse Impacts (PDF)
- 7.0 Irreversible and Irretrievable Aspects of the Proposed Project (PDF)
- 8.0 Growth-Inducing Aspects of the Proposed Project (PDF)
- 9.0 List of References (PDF)
- Appendix A - FSOW (PDF)
- Appendix B - Coastal Modeling Report (PDF)
- Appendix C - WRP & Smart Growth (PDF)
- Appendix D - Historic and Cultural Resources (PDF)
- Appendix E - Natural Resources (PDF)
- Appendix F - Hazardous Materials, F.1a Soil Groundwater Sediment Report (2024) (PDF)
- Appendix F - Hazardous Materials, F.1b Soil Groundwater Sediment Report (PDF)
- Appendix F - Hazardous Materials, F.2 Hazardous Materials RAP & CHASP-(2024) (PDF)
- Appendix F - Hazardous Materials, F.3a Hazardous Materials Investigation & Findings Reports (August 2022) (PDF)
- Appendix F - Hazardous Materials, F.3b Hazardous Materials Investigation & Findings Reports (Feb. 2022) (PDF)
- Appendix F - Hazardous Materials, F.3c Hazardous Materials Investigation & Findings Reports (Feb. 2022) (PDF)
- Appendix F - Hazardous Materials, F.4a Sediment Sampling Analysis (March 2024) (PDF)
- Appendix F - Hazardous Materials, F.4b NYSDEC Sediment Sampling Analysis Approval (April 2024) (PDF)
- Appendix G - Infrastructure (PDF)
- Appendix H - Construction (PDF)
Community Engagement Videos and Presentations
- September 18, 2024: Draft Environmental Impact Statement (DEIS) Public Hearing
- Presentation (PDF) | Video
- Transcript (PDF)
- June 20, 2024: Community Meeting
- FEEDBACK WANTED (EXTENDED): Temporary Space Opportunities (share your thoughts through September 30, 2024)
- Presentation (PDF) | Video
- 60% Design Flythrough Animation
- Questions Received (w/Answers) (PDF)
- Transcript (PDF)
- Exhibition Boards & Topic Table Materials
- Temporary Space Opportunities (Board 1) (PDF)
- Temporary Space Opportunities (Board 2) (PDF)
- Temporary Open Space Map (PDF)
- Tree Impacts and Planting (PDF)
- Project segments; Planting (Biodiversity, Pollinators & Wildlife, Climate Adaptation); Green Infrastructure; Water Quality & Design Considerations; Materials; Flood Barrier System; Benches; Pumphouse Park (PDF)
- SUPPORT POURS IN FOR NORTH/WEST BATTERY PARK CITY RESILIENCY PROJECT
- Hudson River Park Advisory Council: June 11, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Progress Update & Preliminary Construction Schedule): June 6, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 1 & 5): April 16, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 2, 3 & 4): March 18, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 6 & 7): January 4, 2024 | Presentation | Video
- November 30, 2023: Community Meeting
- Interior Drainage Update to Manhattan Community Board 1: October 16, 2023 | Presentation | Video
- North/West Battery Park City Resiliency Project Fall 2023 Project Sitewalks
- June 26, 2023: Community Meeting
- Hudson River Park Advisory Council: June 13, 2023 | Presentation | Video
- Gateway Plaza Tenants Association: May 24, 2023 | Presentation | Video
- Reach Specific Workshops
- Rockefeller Park & Belvedere Plaza: February 8, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- Tribeca & North Esplanade: February 16, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- South Esplanade & South Cove: March 6, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- North Cove: March 15, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- Rockefeller Park & Belvedere Plaza: February 8, 2023
- December 7, 2022 @ CB1 BPC Committee
- Presentation (PDF)
- Video
- Coastal Modeling Paper
- September 19, 2022: Public Meeting #4
- June 29, 2022: Open House/Public Meeting #3
- December 16, 2021 Public Meeting #2
- Summary
- Presentation
- Video: Public Meeting Presentation
- Video: Breakout Room 1
- Video: Breakout Room 2
- Video: Breakout Room 3
- Public Meeting #2 Notice
- Three Community “Walkshops” Through the Project Area
- August 4, 2021 Public Meeting #1
Prior meetings (North BPC Resiliency Project)
The Battery Park City Authority had originally embarked upon the North BPC project as a standalone Design-Bid-Build project, and had completed 30% design when BPCA was granted Design Build Authority by the New York State Legislature in April 2020. As a result, BPCA has determined to proceed with a Progressive Design Build (PDB) approach, which will combine the North BPC Project and the West BPC Project. This PDB approach will provide for the design and construction of the combined North and West BPC Projects (the North/West BPC Resiliency Project) under a single PDB contract.- July 23, 2020 Public Meeting Presentation | Video
- July 23, 2020 Public Meeting Notice
- February 27, 2020 Public Meeting Presentation | Video
- February 27, 2020 Public Meeting Notice
- November 22, 2019 All-Agency Kickoff Meeting – Presentation
- October 1, 2019 Public Meeting Presentation | Video
- October 1, 2019 Public Meeting NoticeNotices
- COMMUNITY NOTICE: NWBPCR PROJECT GEOTECHNICAL SAMPLING WORK AROUND NORTH COVE MARINA
- COMMUNITY NOTICE: NWBPCR PROJECT MARINE BORING WORK
- NORTH/WEST BATTERY PARK CITY RESILIENCY: FALL 2023 PROJECT SITEWALKS
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT: PUBLIC MEETING – JUNE 26
- COMMUNITY NOTICE: NWBPCR PROJECT GEOTECHNICAL SAMPLING WORK
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: NORTH COVE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: SOUTH ESPLANADE & SOUTH COVE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: TRIBECA & THE NORTH ESPLANADE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: ROCKEFELLER PARK & BELVEDERE PLAZA
Construction Updates and Resources
Construction is expected to commence in 2025.
Contact Information
Questions and feedback about NWBPCR can be sent to nwbpcrinfo@bpca.ny.gov or:
Battery Park City Authority
200 Liberty Street, 24th Floor
New York, NY 10281
att: North/West BPC Resiliency Project TeamPublic Announcements and Correspondence
- Review of North/West Battery Park City Resiliency Project Suggested Alignment Alternative (PDF)
- Battery Park City Authority Gets Expanded Capacity to Fund Major Lower Manhattan Resiliency Projects (Gotham Gazette)
- At Workshops, Hear and Be Heard About Massive BPC Resiliency Projects (Tribeca Trib)
- Grasping the Reach: Public Meeting Tonight Will Discuss Park Resiliency Plans for Rockefeller Park and Belvedere Plaza (The Broadsheet)
- Rockefeller reconstruction meetings start this week (Tribeca Citizen)
- NWBPCR Project Public Meeting #4 Questions Received (w/Answers)
- Flood Protection Planning Begins for Long Stretch of Battery Park City (Tribeca Trib)
- BPCA will pursue design/build plans for resiliency in Tribeca and Rockefeller (Tribeca Citizen)
- BPCA Taps Engineering Firm to Design Resiliency Measure for Neighborhood’s Northern Section (The Broadsheet)
- Bold Flood Protection Ideas Eyed for North BPC and Part of Tribeca (Tribeca Trib)
- Some of Tribeca is in Battery Park City’s Plan for Its Flood Protection (Tribeca Trib)
Environmental Review
Draft Environmental Impact Statement Public Hearing (September 18, 2024)
Public Hearing Presentation (PDF) | Video
Transcript (PDF)
Draft Environmental Impact Statement (August 28, 2024)- Notice of Availability (September 4, 2024) (PDF)
- Public Hearing Notice (August 28, 2024) (PDF)
- Cover and Table of Contents (PDF)
- Executive Summary (PDF)
- 1.0 Project Description (PDF)
- 2.0 Analysis Framework (PDF)
- 3.0 Affected Environment (PDF)
- 3.1 Land Use (PDF)
- 3.2 Open Space (PDF)
- 3.3 Historic and Cultural Resources (PDF)
- 3.4 Urban Design and Visual Resources (PDF)
- 3.5 Natural Resources (PDF)
- 3.6 Hazardous Materials (PDF)
- 3.7 Water and Sewer Infrastructure (PDF)
- 3.8 Transportation (PDF)
- 3.9 Greenhouse Gas Emissions and Climate Change (PDF)
- 3.10 Neighborhood Character (PDF)
- 3.11.1 Construction Overview (PDF)
- 3.11.2 Construction Open Space (PDF)
- 3.11.3 Construction Natural Resources (PDF)
- 3.11.4 Construction Transportation (PDF)
- 3.11.5 Construction Air Quality (PDF)
- 3.11.6 Construction Greenhouse Gas Emissions (PDF)
- 3.11.7 Construction Noise (PDF)
- 3.11.8 Construction Neighborhood Character (PDF)
- 4.0 Mitigation (PDF)
- 5.0 Alternatives (PDF)
- 6.0 Unavoidable Adverse Impacts (PDF)
- 7.0 Irreversible and Irretrievable Aspects of the Proposed Project (PDF)
- 8.0 Growth-Inducing Aspects of the Proposed Project (PDF)
- 9.0 List of References (PDF)
- Appendix A - FSOW (PDF)
- Appendix B - Coastal Modeling Report (PDF)
- Appendix C - WRP & Smart Growth (PDF)
- Appendix D - Historic and Cultural Resources (PDF)
- Appendix E - Natural Resources (PDF)
- Appendix F - Hazardous Materials, F.1a Soil Groundwater Sediment Report (2024) (PDF)
- Appendix F - Hazardous Materials, F.1b Soil Groundwater Sediment Report (PDF)
- Appendix F - Hazardous Materials, F.2 Hazardous Materials RAP & CHASP-(2024) (PDF)
- Appendix F - Hazardous Materials, F.3a Hazardous Materials Investigation & Findings Reports (August 2022) (PDF)
- Appendix F - Hazardous Materials, F.3b Hazardous Materials Investigation & Findings Reports (Feb. 2022) (PDF)
- Appendix F - Hazardous Materials, F.3c Hazardous Materials Investigation & Findings Reports (Feb. 2022) (PDF)
- Appendix F - Hazardous Materials, F.4a Sediment Sampling Analysis (March 2024) (PDF)
- Appendix F - Hazardous Materials, F.4b NYSDEC Sediment Sampling Analysis Approval (April 2024) (PDF)
- Appendix G - Infrastructure (PDF)
- Appendix H - Construction (PDF)
Community Engagement Videos and Presentations
- September 18, 2024: Draft Environmental Impact Statement (DEIS) Public Hearing
- Presentation (PDF) | Video
- Transcript (PDF)
- June 20, 2024: Community Meeting
- FEEDBACK WANTED (EXTENDED): Temporary Space Opportunities (share your thoughts through September 30, 2024)
- Presentation (PDF) | Video
- 60% Design Flythrough Animation
- Questions Received (w/Answers) (PDF)
- Transcript (PDF)
- Exhibition Boards & Topic Table Materials
- Temporary Space Opportunities (Board 1) (PDF)
- Temporary Space Opportunities (Board 2) (PDF)
- Temporary Open Space Map (PDF)
- Tree Impacts and Planting (PDF)
- Project segments; Planting (Biodiversity, Pollinators & Wildlife, Climate Adaptation); Green Infrastructure; Water Quality & Design Considerations; Materials; Flood Barrier System; Benches; Pumphouse Park (PDF)
- SUPPORT POURS IN FOR NORTH/WEST BATTERY PARK CITY RESILIENCY PROJECT
- Hudson River Park Advisory Council: June 11, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Progress Update & Preliminary Construction Schedule): June 6, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 1 & 5): April 16, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 2, 3 & 4): March 18, 2024 | Presentation | Video
- Presentation to Manhattan Community Board 1 (Reaches 6 & 7): January 4, 2024 | Presentation | Video
- November 30, 2023: Community Meeting
- Interior Drainage Update to Manhattan Community Board 1: October 16, 2023 | Presentation | Video
- North/West Battery Park City Resiliency Project Fall 2023 Project Sitewalks
- June 26, 2023: Community Meeting
- Hudson River Park Advisory Council: June 13, 2023 | Presentation | Video
- Gateway Plaza Tenants Association: May 24, 2023 | Presentation | Video
- Reach Specific Workshops
- Rockefeller Park & Belvedere Plaza: February 8, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- Tribeca & North Esplanade: February 16, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- South Esplanade & South Cove: March 6, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- North Cove: March 15, 2023
- Workshop Presentation (PDF)
- Workshop Handout (PDF)
- Workshop Booklet (PDF)
- Public Comments (PDF)
- Table Report-Outs (Video)
- Rockefeller Park & Belvedere Plaza: February 8, 2023
- December 7, 2022 @ CB1 BPC Committee
- Presentation (PDF)
- Video
- Coastal Modeling Paper
- September 19, 2022: Public Meeting #4
- June 29, 2022: Open House/Public Meeting #3
- December 16, 2021 Public Meeting #2
- Summary
- Presentation
- Video: Public Meeting Presentation
- Video: Breakout Room 1
- Video: Breakout Room 2
- Video: Breakout Room 3
- Public Meeting #2 Notice
- Three Community “Walkshops” Through the Project Area
- August 4, 2021 Public Meeting #1
Prior meetings (North BPC Resiliency Project)
The Battery Park City Authority had originally embarked upon the North BPC project as a standalone Design-Bid-Build project, and had completed 30% design when BPCA was granted Design Build Authority by the New York State Legislature in April 2020. As a result, BPCA has determined to proceed with a Progressive Design Build (PDB) approach, which will combine the North BPC Project and the West BPC Project. This PDB approach will provide for the design and construction of the combined North and West BPC Projects (the North/West BPC Resiliency Project) under a single PDB contract.- July 23, 2020 Public Meeting Presentation | Video
- July 23, 2020 Public Meeting Notice
- February 27, 2020 Public Meeting Presentation | Video
- February 27, 2020 Public Meeting Notice
- November 22, 2019 All-Agency Kickoff Meeting – Presentation
- October 1, 2019 Public Meeting Presentation | Video
- October 1, 2019 Public Meeting NoticeNotices
- COMMUNITY NOTICE: NWBPCR PROJECT GEOTECHNICAL SAMPLING WORK AROUND NORTH COVE MARINA
- COMMUNITY NOTICE: NWBPCR PROJECT MARINE BORING WORK
- NORTH/WEST BATTERY PARK CITY RESILIENCY: FALL 2023 PROJECT SITEWALKS
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT: PUBLIC MEETING – JUNE 26
- COMMUNITY NOTICE: NWBPCR PROJECT GEOTECHNICAL SAMPLING WORK
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: NORTH COVE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: SOUTH ESPLANADE & SOUTH COVE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: TRIBECA & THE NORTH ESPLANADE
- NORTH / WEST BATTERY PARK CITY RESILIENCY PROJECT REACH WORKSHOP: ROCKEFELLER PARK & BELVEDERE PLAZA
Construction Updates and Resources
Construction is expected to commence in 2025.
LOADING RESULTS...Copyright © 2024 BPCA / Site created by Revolver Studios
North/West Battery Park City Resiliency Project
Stay up to date on all NWBPCR information here.
The combined North/West Battery Park City Resiliency Project contemplates the creation of an integrated coastal flood risk management system from First Place, north along the Battery Park City Esplanade, across to the east side of West Street/Route 9A, and terminate above Chambers Street at a high point on Greenwich Street. Work will proceed through a progressive design-build effort.
In summary, the principal purposes of the NWBPCR Project are to:
- Provide a reliable coastal flood barrier system to provide risk reduction to property, residents and assets within the vicinity of Battery Park City that addresses the design storm event;
- Preserve, enhance, and protect to the maximum extent practicable and integrate to the proposed design the open space and waterfront cultural resources of Battery Park City;
- Preserve and enhance the character, accessibility, including universal access, and design aesthetic of the community and its interface with the BPC waterfront and access to coastal view sheds, particularly views of the Hudson River, the New York Harbor, and the Statue of Liberty; and
- Avoid or minimize disruption to existing below and above-ground infrastructure (i.e., water and sewer infrastructure, tunnels, utilities, etc.) from both construction impacts and flood events.
Specific objectives of the NWBPCR Project are to:
- Provide a reliable and adaptable coastal flood barrier system that minimizes risk and the need for operational interventions by relying on passive flood control rather than mechanical “deployable” flood barrier systems to the extent practicable;
- Minimize urban heat island effect and enhance outdoor occupant thermal safety to the extent practicable;
- Construct and operate the project in an environmentally responsible manner; and
- Utilize cost-effective low-impact solutions to maximize capital investment over the lifespan of the NWBPCR Project.
For more information on our resiliency plans, please visit https://bpca.ny.gov//nature-and-sustainability/resiliency/.