North/West Battery Park City Resiliency Project

North/West Battery Park City Resiliency Project

FEEDBACK WANTED – Please share your thoughts on Temporary Space Opportunities during construction of North/West Battery Park City Resiliency Project. Feedback accepted through
September 2, 2024.

Click here to provide feedback

And keep up to date on the latest project updates at these upcoming public engagement sessions:

Monday, July 15: Manhattan CB1 Environmental Protection Committee, 6PM (remote access: https://live.mcb1.nyc)

Monday, July 22: Manhattan CB1 Battery Park City Committee, 6PM (remote access: https://live.mcb1.nyc)

The combined North/West Battery Park City Resiliency Project contemplates the creation of an integrated coastal flood risk management system from First Place, north along the Battery Park City Esplanade, across to the east side of West Street/Route 9A, and terminate above Chambers Street at a high point on Greenwich Street. Work will proceed through a progressive design-build effort.

In summary, the principal purposes of the NWBPCR Project are to:

  • Provide a reliable coastal flood barrier system to provide risk reduction to property, residents and assets within the vicinity of Battery Park City that addresses the design storm event;
  • Preserve, enhance, and protect to the maximum extent practicable and integrate to the proposed design the open space and waterfront cultural resources of Battery Park City;
  • Preserve and enhance the character, accessibility, including universal access, and design aesthetic of the community and its interface with the BPC waterfront and access to coastal view sheds, particularly views of the Hudson River, the New York Harbor, and the Statue of Liberty; and
  • Avoid or minimize disruption to existing below and above-ground infrastructure (i.e., water and sewer infrastructure, tunnels, utilities, etc.) from both construction impacts and flood events.

Specific objectives of the NWBPCR Project are to:

  • Provide a reliable and adaptable coastal flood barrier system that minimizes risk and the need for operational interventions by relying on passive flood control rather than mechanical “deployable” flood barrier systems to the extent practicable;
  • Minimize urban heat island effect and enhance outdoor occupant thermal safety to the extent practicable;
  • Construct and operate the project in an environmentally responsible manner; and
  • Utilize cost-effective low-impact solutions to maximize capital investment over the lifespan of the NWBPCR Project.

– NWBPCR Project: Frequently Asked Questions (May 2023)

For more information on our resiliency plans, please visit https://bpca.ny.gov//nature-and-sustainability/resiliency/.